Cline Pointe      Superior office environment for the success-minded professional
Home    About Cline Pointe    Our Facility    Condominium Ownership    Tenant Improvements    Floor Plans    Contact Us

New Construction by WR Hanson, Inc., Kirkland, WA.  
www.wrhanson.com

Very detailed with exceptional features, including: 

         Security: A modern Access Control Card reader outside of each entrance will provide for keyless entry and access management with time log. The two front doors are set up for electric locks at specific times.

         Access Control in private staircase and CCTV (cameras) in garage and outside of building will consist of  (8) BW high-resolution cameras strategically located for optimum coverage. All video signals are processed and displayed on video monitor. Time lapse VCR or Digital Video Recorder will provide for storage of video material.

         Access Control for garage (general parking) will utilize special garage door openers for management with time log.

Exceptional Signage and Exposure

 Sign plan includes strategically placed signage on the building and a very visib1e backlit exposure on the roadside monument.  

 Outstanding Mukilteo Location.

 You are less than 2 blocks from the Mukilteo Speedway at the gateway to Harbour Pointe and a short distance from the 1-5 corridor for easy access.

Right click on the following video links to download video clips of our building.  You can view the AVI clips by downloading Apple's QuickTime player free here.

Click the following links to see the floor layout:  Floor Plans
 

.

 

Copyright 2004 Cline Pointe.  |  Contact Us